SWMS Skip Bins
Original price
$79.75
-
Original price
$79.75
Original price
$79.75
$79.75
-
$79.75
Current price
$79.75
This pre-written Skip Bins Safe Work Method Statement template provides the typical work steps, safety controls and possible hazards associated with loading and unloading skip bins from a vehicle. This comprehensive Skip Bins Safe Work Method Statement will form an essential part of your Safety Management System if your business is responsible for this machinery. Simply add your company branding and this 11 page Skip Bins SWMS will be ready to use in your business today!
Skip Bins Safe Work Method Statement covers:
- Planning the work
- PPE
- Services / Utilities
- Working outside
- Manual handling
- Working near roads
- Skip bin truck checks and maintenance
- Refuelling skip bin truck
- Loading and unloading skips
- Completion of work
Skip Bins Safe Work Method Statement includes:
- Risk assessment guidelines and risk rating calculator
- Step by step procedures
- Possible hazards
- Safety controls
- Safety responsibilities
- Personal Protective Equipment (PPE)
- Plant and equipment
- Legislation, regulations, codes and standards
- Worker signoff
Skip Bins Safe Work Method Statement features:
- User friendly
- Instant download
- Fully editable Microsoft Word format allows easy customisation
- Step by step procedure showing how to add your Company details:
- Microsoft Word for PC Click Here
- Microsoft Word for Apple Mac Click Here
- Step by step procedure showing how to add "site specific" information Click Here
- Suitable for all Bins or Skip Bin Hire
Skip Bins Safe Work Method Statement References and Standards:
- Work Health and Safety Act 2011
- Work Health and Safety Regulations 2017
- SWA COP First Aid in the Workplace
- SWA COP Hazardous Manual Tasks
- SWA COP How to Manage Work Health and Safety Risks
- SWA COP Managing Noise and Preventing Hearing Loss at Work
- SWA COP Managing Risks of Hazardous Chemicals in the Workplace
- AS/NZS 4602.1:2011 - High visibility safety garments Garments for high risk applications
- AS 1742.3:2019 - Manual of Uniform Traffic Control Devices – Traffic Control for Works on Roads