Skip to content
PROUDLY SUPPORTING AUSTRALIAN BUSINESSES SINCE 2010!
CALL 1800 304 336 TODAY FOR FREE ADVICE - ALL TEMPLATES 2024 COMPLIANT.
SUPPORTING AUSSIE BUSINESSES SINCE 2010!
CALL 1800 304 336 TODAY FOR FREE ADVICE.

SWMS Pack - Roadwork

Original price $1,140.00 - Original price $1,140.00
Original price
$1,140.00
$1,140.00 - $1,140.00
Current price $1,140.00

Roadwork Safe Work Method Statements Bundle

This Roadwork SWMS Bundle has been developed to provide Roadwork businesses with a set of pre-written and compliant SWMS that are available for instant download and use in your business. All Roadwork SWMS Templates are provided in fully editable Microsoft Word format and include the relevant step by step procedures, typical hazards, safety controls, responsibilities, risk matrix, PPE etc.

All Occupational Safety Solutions SWMS templates contain generic pre-written procedures which are compliant with the Model Work Health and Safety (WHS) Act, Model WHS Regulations, relevant Model Codes of Practice and Australian Standards.

If you require a Roadwork Safe Work Method Statements Pack containing different SWMS, one of our consultants can help create a discounted SWMS Pack specific to your business needs. Please contact us today to discuss how we may assist with our fully compliant Roadwork SWMS templates.

This Roadwork Safe Work Method Statements Bundle contains 43 SWMS’s.

60% OFF Roadwork SWMS when purchased as a bundle - Price: $1,140.00 (discount compared to individual SWMS pricing).

Roadwork Safe Work Method Statements include:

Work Process SWMS

  1. Articulated Hauler
  2. Asphalt Paving Machine
  3. Backhoe
  4. Concrete Core Drilling
  5. Concrete Pumping
  6. Concreting
  7. Cordless Power Tools
  8. COVID-19 (Working around others during COVID-19)
  9. Dozer
  10. Driving Vehicles
  11. Dump Truck
  12. Earth Moving Equipment
  13. Electricity and Power Tool Safety
  14. Excavation or Trenching
  15. Excavator
  16. Front End Loader
  17. Grader
  18. Hazardous Substances and Chemical Use
  19. Loading and Unloading Vehicles
  20. Manual Handling
  21. Pipelayer Machine
  22. Prime Mover
  23. Respirable Crystalline Silica (RCS) Dust Control
  24. Roller Compaction
  25. Site Establishment
  26. Skid Steer Loader
  27. Stormwater Drainage Installation
  28. Traffic Management
  29. Water Truck
  30. Worksite Hazards

Tools SWMS

  1. Auger / Post Hole Digger
  2. Chain Trencher
  3. Compressed Air
  4. Concrete Mixer - Portable
  5. Concrete Saw - Quick Cut
  6. Explosive Power Tools
  7. Fuel Powered Tool Safety
  8. Generator
  9. Hand Tools
  10. High Pressure Water Cleaner
  11. Jack Hammer
  12. Plate Compactor
  13. Water Pump - Petrol

Features of the Roadwork Safe Work Method Statements bundle:

  • Pre-written procedures – simply add your company details
  • Fully editable Microsoft Word format
  • Instant download
  • All products backed by FREE phone and email support!
  • No subscriptions or ongoing fees!!

SWMS Expample button orangeOccupational Safety Solutions Roadwork Safe Work Method Statements have been created to provide business owners with SWMS relevant to performing roadwork activities or using tools and equipment applicable to roadwork.

Visit our Safe Work Method Statements page for for a full list of Safe Work Method Statements available for instant download.